Thursday, November 5, 2009

Get your shine on!

We managed to sneak down to Scituate last night and do another round of epoxy.  Almost all the parts have two coats on them, and this will set us up well to actually start stitching the boat together on the weekend.

One big problem is that I am not happy with the puzzle joint on the bottom panel.  It seems that our two tables were slightly out of true (about 1/8") which in conjunction with not enough clamping area has caused the fingers to be a little askew.  I am afraid that if we just sand it down we are going to go through the first layer (veneer) of the plywood.  Unfortunately no photos to show the problem, frankly a little embarrassed that it is a problem.  Current thinking is to go ahead and blow through the veneer on the top with a belt sander, a fill if necessary with wood flour thickened epoxy.  This will leave a fairly unattractive slice on the bottom inside of the hull - but it looks like the joint is mostly under the center seat.  On the outside it does not matter much as it will be painted.  I don't think the variance is enough to affect strength - especially as this part will have fiberglass on both sides.  Only other choice is to order new parts - we will start with above and if really ugly consider the delay a cost of this.

In the meantime a few pics...

Strakes with two coat - shiny:


Pieces and parts:



Close up:



Pics to come this weekend of the puzzle joint conundrum.  Also a story of a very very fein sander.


Monday, November 2, 2009

Epoxy and Sanding

No new pictures this week as the camera was not plugged in over the week, and immediately shut-off due to dead battery.

We did make nice progress though, and were able to sneak in three epoxy, sand, epoxy cycles.  We are nearing the end of the pre-production - soon we can actually start to build a boat.  One more weekend should have all the parts epoxied.

Starting to think about some of the enhancements we want to build in.  Several of the ones that are appealing can be found here: Solid Mahogany Re-enforcements.  Also thinking of applying the fiberglass to the bottom and first strake on the exterior, I think this would add a significant margin of strength.  We are still a long way from there - however.

Monday, October 26, 2009

It Begins... for real!

The boxes were patiently awaiting our arrival to Scituate on Friday.  At least waiting for me - Brianne was tied up at work so I got to have a guilty first peak at the components. Four boxes arrived and were stacked in the basement.




And I began to open the presents:







Brianne soon arrived and we began the "Inventory" - a few parts are back ordered but nothing we need in the short term (sails for example are a fair bit away, as are oars). Everything - ready for inventory:



Some friends I have talked to have asked about how it is all fastened together.  Here is a pic of all the hardware used in the PMD (the wire is actually just used in construction and will be removed and thrown away).


The very important - crucial book:



The real "fastener" is the epoxy - super super glue of the 21st century:



Let's start assembly - where we find the first surprise.  All other blogs and instructions I have seem for the PMD have scarf joined strakes and bottom panels.  Not so with ours which has "puzzle" joints.  The jury (and least of Brianne and I) is out on this.  Seems like it will be really hard to disguise these joints under varnish - and we are not sure how pretty they will be.  Not much we can do about it though - other than start gluing them up.


And our first cup of epoxy:



And we glue the OutValves - well outwales anyway - which most of us know at gunwales (pic of the jig first and then the glue up):





After the first wait of twenty-four hours we cleared the table and started the remaining pieces: #4 strake, the bottom panel, and initial thin coat of epoxy on the two transoms and the center board trunk:



Amazing how the grain comes out with just one coat - these pictures look glossy but the finish is still very rough (feels like 60 grit sandpaper).

We will continue again next weekend.  It will be a challenge with the epoxy dry time - really only giving us two cycles a weekend to do work on it.  But the house has plenty of other project to be done to fill the time while we wait.

Total hours into project including unpacking, and assembly about 8.  Look for another update next week.


Thursday, October 15, 2009

On its Way!!!

Final it seems that the good folks CLC Boats have completed the cutting of our kit, and it is enroute.  Too bad it won't make it for the weekend.  Who actually knows when it will arrive?  The odd tracking site does not show an expected delivery date - but as best as I can make out right now it will be in Newark at 02:30 on 10/16...  not sure what that means in terms of Scituate arrival.

Track for yourself at: http://www.dbschenkerusa.com/dynamic_frameset.html?data.node.id=21097&data.language.id=28&request.page_template.frame=dynamic_frameset&request.frame.url=/apps/Tracking/TrackResults.aspx&trackby=H&trackbyno=51479470

Monday, October 5, 2009

Other Projects

While we continue to wait for the arrival of our Passagemaker kit, we started on some other projects.

Fixed the lighting in the basement - all work areas are now nicely illuminated.

Started drying out the Sunfish.  For those unfamiliar with Sunfish construction - the hull is fiberglass wrapped around flotation foam.  Although the boat has a drain plug, over the years moisture starts to permanently make its way into the foam cells, over time this can add significant weight to the boat.  By cutting access ports into the bow and stern we can flow air through the hull, and hopefully reverse the process.  We will even accelerate this by using de-humidfyed air that will be ducted in using dryer hose.

Clean the boat up a bit:



















and the de-humidyfier that we will use:




















Will post some more pictures of what the hooked up apparatus looks like next weekend.

Kit should ship on Friday - can't wait - this is worse than Christmas as a kid.

Thursday, September 24, 2009

Waiting...

The boat kit has been ordered, unfortunately looks like it won't ship until October 9th. Delay being blamed on unexpected demand (maybe the recession is over?). Won't be much to report on until then.

Monday, September 21, 2009

Etchells North Americans - No Progress on Passagemaker

No real work on the dinghy this week. Spent the week in Toronto at the Etchells North American Championship. Big wind on Friday redeemed us from a terrible start to the regatta on Thursday.

Kite setting at windward mark:

First to finish in final race:

First amateur boat:

Fourth place overall in the regatta:


Toronto is really a wonderful place to sail!

Passagemaker news? Yes - kit was ordered - hopefully have construction photos soon.


Monday, September 14, 2009

Building the Factory


A cart full of lumber:



A little sawing and screwing:


With some better lighting the Passagemaker factory is ready for production:




Saturday, September 12, 2009

It Begins

The project begins tomorrow morning. Off to storage unit for tools, and hardware store for work benches. We will begin converting Mary's basement into the dinghy factory...